Special Traffic Block between Asangaon and Vasind on 17.6.2013
Central Railway operates a special traffic block between the stations Asangaon and Vasind on 17th June, 2013.
SPECIAL TRAFFIC BLOCK BETWEEN ASANGAON-VASIND on 17.6.2013
Central Railway will operate traffic block on Up and Dn north east lines between Asangaon and Vasind for engineering works as under -
ON UP & DN LINES BETWEEN ASANGAON AND VASIND FROM 10.20 AM TO 11.20 AM (1 HOUR) ON 17.6.2013 (MONDAY)
CANCELLATION OF 2 SUBURBAN TRAINS on 17.6.2013
1. Asangaon local leaving CST at 9.26 am &
2. CST local leaving Asangaon at 11.16 am will remain cancelled.
RESCHEDULING OF SUBURBAN TRAIN on 17.6.2013
1. CST local scheduled to leave Kasara at 10.10 hrs will be rescheduled to leave Kasara at 10.40 hrs.
Mail/express trains arriving Mumbai during the block period will also be regulated and arrive their destination 10 to 20 minutes behind schedule.
Passengers are requested to kindly bear with the Railway Administration for the inconvenience caused.
Central Railway operates a special traffic block between the stations Asangaon and Vasind on 17th June, 2013.
SPECIAL TRAFFIC BLOCK BETWEEN ASANGAON-VASIND on 17.6.2013
Central Railway will operate traffic block on Up and Dn north east lines between Asangaon and Vasind for engineering works as under -
ON UP & DN LINES BETWEEN ASANGAON AND VASIND FROM 10.20 AM TO 11.20 AM (1 HOUR) ON 17.6.2013 (MONDAY)
CANCELLATION OF 2 SUBURBAN TRAINS on 17.6.2013
1. Asangaon local leaving CST at 9.26 am &
2. CST local leaving Asangaon at 11.16 am will remain cancelled.
RESCHEDULING OF SUBURBAN TRAIN on 17.6.2013
1. CST local scheduled to leave Kasara at 10.10 hrs will be rescheduled to leave Kasara at 10.40 hrs.
Mail/express trains arriving Mumbai during the block period will also be regulated and arrive their destination 10 to 20 minutes behind schedule.
Passengers are requested to kindly bear with the Railway Administration for the inconvenience caused.
No comments:
Post a Comment